{"id":2161,"date":"2026-08-25T12:19:40","date_gmt":"2026-08-25T12:19:40","guid":{"rendered":"https:\/\/supplierally.com\/uncategorized\/china-supplier-rework-control\/"},"modified":"2026-08-25T12:19:40","modified_gmt":"2026-08-25T12:19:40","slug":"china-supplier-rework-control","status":"publish","type":"post","link":"https:\/\/supplierally.com\/es\/uncategorized\/china-supplier-rework-control\/","title":{"rendered":"How to Control Rework and Repair With China Suppliers Before Shipment"},"content":{"rendered":"<p>A factory may say it can \u201cfix the issue\u201d without explaining what was wrong, how many goods are affected, what will change, or how the corrected units will be checked. That is not enough for a buyer deciding whether reworked products should ship. Rework can restore a product to the agreed requirement, but it can also create new risks if the factory changes parts, finishes, labels, packaging, or function without a defined plan.<\/p>\n<p>A <strong>China supplier rework control<\/strong> process turns a proposed correction into a controlled decision. It identifies the original nonconformity, holds the affected scope, defines the correction method and materials, records what was done, reinspects the corrected goods, and releases only the verified scope. It also preserves the original failure record so a later buyer review can distinguish a one-time correction from a recurring process issue.<\/p>\n<p>This is general sourcing and quality guidance. It does not determine whether a repair is technically safe, contractually acceptable, or compliant with a product regulation. Buyers should use qualified engineering, regulatory, testing, quality, and legal professionals for product-specific, safety-critical, or regulated decisions.<\/p>\n<blockquote>\n<p>A reworked product should return to a defined requirement through a defined process, not through an informal promise to make it look better.<\/p>\n<\/blockquote>\n<h2>Identify the defect and affected scope first<\/h2>\n<p>Before the factory starts rework, ask it to state what is nonconforming and where the issue was found. A vague description such as \u201cminor defect\u201d makes it impossible to assess the correct remedy. The buyer needs the product identity, defect condition, requirement that was not met, evidence, discovery stage, and initial affected scope.<\/p>\n<table>\n<thead>\n<tr>\n<th>Defect record field<\/th>\n<th>Buyer question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product identity<\/td>\n<td>Which SKU, revision, color, size, configuration, or customer version is affected?<\/td>\n<\/tr>\n<tr>\n<td>Defect condition<\/td>\n<td>What is wrong, where is it located, and how is it visible or measured?<\/td>\n<\/tr>\n<tr>\n<td>Requirement reference<\/td>\n<td>Which drawing, approved sample, work instruction, PO, or inspection criterion was not met?<\/td>\n<\/tr>\n<tr>\n<td>Discovery point<\/td>\n<td>Was it found during production, final inspection, packing, warehouse receipt, or customer use?<\/td>\n<\/tr>\n<tr>\n<td>Evidence<\/td>\n<td>Are photos, measurements, samples, or inspection records available?<\/td>\n<\/tr>\n<tr>\n<td>Initial quantity<\/td>\n<td>How many units, cartons, lots, or production dates may be affected?<\/td>\n<\/tr>\n<tr>\n<td>Product status<\/td>\n<td>Are goods in process, packed, loaded, shipped, or held at a warehouse?<\/td>\n<\/tr>\n<tr>\n<td>Containment owner<\/td>\n<td>Who is responsible for physically preventing affected goods from release?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not ask the supplier to immediately begin rework while these facts are unknown. First protect the buyer\u2019s options by identifying and holding the affected product. A small defect found in a single carton may still share a process, component, fixture, label, or operator condition with a wider production range.<\/p>\n<h2>Segregate goods before planning correction<\/h2>\n<p>The supplier should physically separate the suspect scope from accepted goods and identify it with a clear hold status. This helps prevent a worker from picking a rework carton for shipment or mixing uncorrected stock with corrected output. The level of containment should match the available evidence.<\/p>\n<table>\n<thead>\n<tr>\n<th>Product state<\/th>\n<th>Initial containment action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Work in process<\/td>\n<td>Stop the relevant operation and identify units or trays affected<\/td>\n<\/tr>\n<tr>\n<td>Finished but unpacked<\/td>\n<td>Move to a marked hold area and separate from normal inventory<\/td>\n<\/tr>\n<tr>\n<td>Packed cartons<\/td>\n<td>Identify carton range, pallet position, and order scope before opening or relabeling<\/td>\n<\/tr>\n<tr>\n<td>Loaded cargo<\/td>\n<td>Escalate through authorized logistics and commercial owners before moving goods or documents<\/td>\n<\/tr>\n<tr>\n<td>Stock at warehouse<\/td>\n<td>Quarantine the defined locations and preserve carton or lot identity<\/td>\n<\/tr>\n<tr>\n<td>Mixed or uncertain scope<\/td>\n<td>Hold the broader credible range until the supplier can establish a defensible boundary<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Containment is not a conclusion that the entire order failed. It is a temporary control that stops an uncertain situation from becoming a shipment problem. The factory can reduce the held scope after it provides factual evidence about lots, dates, stations, materials, and inspection history.<\/p>\n<h2>Distinguish rework, repair, sorting, relabeling, and repacking<\/h2>\n<p>These actions can look similar on a factory floor but have different implications. The buyer should name the proposed action and define what it is intended to achieve. A product may need more than one action, such as sorting to isolate the defect, rework to correct it, and reinspection to confirm it meets the requirement.<\/p>\n<table>\n<thead>\n<tr>\n<th>Acci\u00f3n<\/th>\n<th>Buyer-side meaning<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sorting<\/td>\n<td>Separates suspect, acceptable, and rejected units using a defined criterion<\/td>\n<\/tr>\n<tr>\n<td>Rework<\/td>\n<td>Changes a nonconforming product so it is intended to meet the specified requirement<\/td>\n<\/tr>\n<tr>\n<td>Repair<\/td>\n<td>Restores or changes a product, potentially requiring technical review of function or appearance<\/td>\n<\/tr>\n<tr>\n<td>Relabeling<\/td>\n<td>Corrects labels, artwork, variable data, or placement under controlled instruction<\/td>\n<\/tr>\n<tr>\n<td>Repacking<\/td>\n<td>Replaces or corrects cartons, inserts, protective materials, or pack-out configuration<\/td>\n<\/tr>\n<tr>\n<td>Replacement<\/td>\n<td>Removes nonconforming product and supplies newly produced conforming product<\/td>\n<\/tr>\n<tr>\n<td>Scrap or rejection<\/td>\n<td>Removes product from release because a defined correction is not accepted<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The current U.S. medical-device QMSR defines rework as action taken on nonconforming product so it will fulfill specified requirements before release for distribution.<a href=\"https:\/\/www.ecfr.gov\/current\/title-21\/chapter-I\/subchapter-H\/part-820\" title=\"eCFR: 21 CFR Part 820 Quality Management System Regulation\" target=\"_blank\" rel=\"noopener\">1<\/a> This definition belongs to a regulated-device context. It is still a useful operational boundary for buyers of other products: if the supplier cannot state which requirement the corrected product will meet, the proposed action is not yet a controlled rework plan.<\/p>\n<h2>Require a written rework instruction<\/h2>\n<p>A factory should not rely on verbal instructions such as \u201cpolish the marks\u201d or \u201cchange the labels.\u201d Ask for a written plan that identifies the defect, scope, method, tools, materials, product-protection steps, inspection requirement, and release owner. The plan should state whether the process changes the product\u2019s form, fit, function, finish, traceability, packaging, or claimed status.<\/p>\n<table>\n<thead>\n<tr>\n<th>Rework-plan field<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Defect and scope<\/td>\n<td>Prevents a broad or narrow correction based on guesswork<\/td>\n<\/tr>\n<tr>\n<td>Product and revision<\/td>\n<td>Keeps the plan tied to the correct configuration<\/td>\n<\/tr>\n<tr>\n<td>Rework method<\/td>\n<td>Defines exact steps rather than ad hoc operator judgment<\/td>\n<\/tr>\n<tr>\n<td>Tools and materials<\/td>\n<td>Identifies polish, replacement part, label, adhesive, carton, or fixture used<\/td>\n<\/tr>\n<tr>\n<td>Protection steps<\/td>\n<td>Prevents damage to finished surfaces, labels, or adjacent components<\/td>\n<\/tr>\n<tr>\n<td>Operator qualification<\/td>\n<td>Assigns the appropriate trained or authorized factory personnel<\/td>\n<\/tr>\n<tr>\n<td>Inspection after rework<\/td>\n<td>States what is checked, by whom, and against which criterion<\/td>\n<\/tr>\n<tr>\n<td>Traceability rule<\/td>\n<td>Defines how reworked units or cartons remain identifiable<\/td>\n<\/tr>\n<tr>\n<td>Disposition of removed material<\/td>\n<td>Controls incorrect labels, parts, cartons, or scrap<\/td>\n<\/tr>\n<tr>\n<td>Release requirement<\/td>\n<td>Identifies who may authorize reworked goods for shipment<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The buyer may approve the concept of a rework plan but still require a first corrected sample or trial unit before the factory reworks the full lot. This is particularly important when the work affects surface finish, fit, sealing, electrical or mechanical function, labels, customer packaging, or product identity.<\/p>\n<h2>Control replacement materials and components<\/h2>\n<p>Rework sometimes introduces a new material, label, component, coating, adhesive, carton, or software setting. The supplier should identify the source and revision of any replacement input. Do not allow a defect correction to become an unapproved substitution.<\/p>\n<table>\n<thead>\n<tr>\n<th>Rework input<\/th>\n<th>Buyer control<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Replacement component<\/td>\n<td>Confirm part number, revision, source rule, and compatibility with product configuration<\/td>\n<\/tr>\n<tr>\n<td>Label or artwork<\/td>\n<td>Use the current controlled revision and check variable data before application<\/td>\n<\/tr>\n<tr>\n<td>Adhesive, coating, or finish<\/td>\n<td>Obtain qualified technical review if it affects product performance, appearance, or safety<\/td>\n<\/tr>\n<tr>\n<td>Packaging material<\/td>\n<td>Verify carton, insert, bag, foam, and protection match the approved pack-out<\/td>\n<\/tr>\n<tr>\n<td>Fastener or hardware<\/td>\n<td>Confirm specification, torque or assembly method where required, and traceability rule<\/td>\n<\/tr>\n<tr>\n<td>Software or programmed setting<\/td>\n<td>Route to the authorized technical owner before use<\/td>\n<\/tr>\n<tr>\n<td>Cleaning or polish material<\/td>\n<td>Check that it will not damage or change surfaces, markings, or product performance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A correct-looking replacement part is not proof that it is the approved part. Link the rework materials to the same product and change-control baseline used for normal production.<\/p>\n<h2>Use a trial before full-lot rework when risk is material<\/h2>\n<p>For a simple label correction, the buyer may only need a first reworked unit and photo evidence. For a complex repair, require a trial on representative samples before the supplier touches the full lot. Review the result against the original requirement, not only against the original defect.<\/p>\n<table>\n<thead>\n<tr>\n<th>Rework situation<\/th>\n<th>Appropriate trial evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Surface polish or cosmetic repair<\/td>\n<td>Before-and-after photos, approved appearance comparison, and defined inspection result<\/td>\n<\/tr>\n<tr>\n<td>Relabeling<\/td>\n<td>Correct artwork, placement view, barcode scan, and obsolete-label control<\/td>\n<\/tr>\n<tr>\n<td>Component replacement<\/td>\n<td>Assembly evidence, functional check, and replacement-part identity<\/td>\n<\/tr>\n<tr>\n<td>Repacking<\/td>\n<td>Carton and insert check, pack-out evidence, and shipping-mark verification<\/td>\n<\/tr>\n<tr>\n<td>Functional repair<\/td>\n<td>Controlled test instruction, result record, and technical review where needed<\/td>\n<\/tr>\n<tr>\n<td>Large lot sorting<\/td>\n<td>Defined defect standard, sample of inspector decisions, and scope record<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>If the trial does not meet the requirement, stop and reassess. Do not treat repeated attempts as production output. The factory should document the failed attempt and the next proposed action so the buyer can see what changed.<\/p>\n<h2>Reinspect the corrected output<\/h2>\n<p>Rework is not complete when the operator says the product is fixed. The factory should inspect the defined corrected scope after the work. The buyer should decide whether the original inspection plan still applies, whether an added check is needed, and whether an independent inspection is appropriate.<\/p>\n<table>\n<thead>\n<tr>\n<th>Reinspection point<\/th>\n<th>Evidence to request<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Original defect area<\/td>\n<td>Shows that the stated nonconformity was corrected<\/td>\n<\/tr>\n<tr>\n<td>Adjacent surfaces or components<\/td>\n<td>Checks for damage created during rework<\/td>\n<\/tr>\n<tr>\n<td>Product identity<\/td>\n<td>Confirms correct SKU, revision, label, and configuration after correction<\/td>\n<\/tr>\n<tr>\n<td>Function or fit<\/td>\n<td>Verifies relevant behavior when the repair could affect it<\/td>\n<\/tr>\n<tr>\n<td>Packaging and carton mark<\/td>\n<td>Confirms reworked goods are packed to the approved requirement<\/td>\n<\/tr>\n<tr>\n<td>Lot or carton range<\/td>\n<td>Links inspected results to the specific corrected output<\/td>\n<\/tr>\n<tr>\n<td>Rework record<\/td>\n<td>Connects the inspection result to method, operator, date, and scope<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For a broad rework lot, use a defined sample or 100 percent check based on the defect, correction method, product risk, and buyer requirements. A third-party pre-shipment inspection can provide an additional view, but it should know that rework occurred and which conditions need focused checking.<\/p>\n<h2>Preserve the original defect and correction history<\/h2>\n<p>Do not overwrite the first inspection result after rework passes. Retain the original finding, containment, rework instruction, materials used, execution record, reinspection result, and final release decision. This history helps both sides see whether a recurring condition is being corrected at the source or merely hidden through repeated rework.<\/p>\n<table>\n<thead>\n<tr>\n<th>Record item<\/th>\n<th>Why retain it<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Original nonconformity<\/td>\n<td>Shows the condition that triggered rework<\/td>\n<\/tr>\n<tr>\n<td>Affected quantity and lot<\/td>\n<td>Defines scope and later traceability<\/td>\n<\/tr>\n<tr>\n<td>Hold and segregation record<\/td>\n<td>Shows the goods were controlled before release<\/td>\n<\/tr>\n<tr>\n<td>Rework instruction<\/td>\n<td>States the approved correction method<\/td>\n<\/tr>\n<tr>\n<td>Materials and tools used<\/td>\n<td>Identifies introduced inputs and process conditions<\/td>\n<\/tr>\n<tr>\n<td>Execution evidence<\/td>\n<td>Connects work to operator, date, shift, or station<\/td>\n<\/tr>\n<tr>\n<td>Reinspection results<\/td>\n<td>Shows whether corrected goods met the specified requirement<\/td>\n<\/tr>\n<tr>\n<td>Final release<\/td>\n<td>Identifies the authorized shipment decision<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The FDA states that the QMSR effective in February 2026 incorporates ISO 13485:2016 for medical-device quality systems and is intended to help manufacturers consistently meet applicable requirements and specifications.<a href=\"https:\/\/www.fda.gov\/medical-devices\/postmarket-requirements-devices\/quality-management-system-regulation-qmsr\" title=\"FDA: Quality Management System Regulation\" target=\"_blank\" rel=\"noopener\">2<\/a> That regulated framework does not prescribe a commercial buyer\u2019s rework form. It reinforces a general lesson: a quality system must make correction and release evidence visible rather than relying on informal assurances.<\/p>\n<h2>Escalate repeated defects and shipped scope<\/h2>\n<p>A rework plan can solve the immediate lot while leaving the underlying process unchanged. Ask the factory to escalate when the defect repeats, the rework rate grows, the correction changes product performance or claimed characteristics, or affected goods have already left the factory. The buyer should coordinate with appropriate technical, legal, quality, and commercial owners before deciding on recovery actions.<\/p>\n<table>\n<thead>\n<tr>\n<th>Escalation trigger<\/th>\n<th>Buyer response<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Same defect repeats across lots<\/td>\n<td>Request cause investigation and prevention action before normal release resumes<\/td>\n<\/tr>\n<tr>\n<td>Rework rate increases<\/td>\n<td>Review production, component, fixture, operator, and inspection conditions<\/td>\n<\/tr>\n<tr>\n<td>Repair changes function or safety<\/td>\n<td>Obtain qualified engineering or regulatory review before release<\/td>\n<\/tr>\n<tr>\n<td>Affected goods are loaded or shipped<\/td>\n<td>Identify shipment scope and use authorized logistics and customer escalation paths<\/td>\n<\/tr>\n<tr>\n<td>Factory cannot establish affected scope<\/td>\n<td>Hold a broader credible range and seek additional evidence<\/td>\n<\/tr>\n<tr>\n<td>Rework cannot restore requirement<\/td>\n<td>Replace, reject, or obtain authorized disposition rather than force a release<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The purpose is not to punish a supplier for finding a defect. A factory that identifies, contains, and documents a problem early is easier to manage than one that quietly repairs or ships it. The buyer should reward transparency while requiring controlled evidence.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>What is China supplier rework control?<\/h3>\n<p>It is a buyer and factory process for correcting nonconforming goods through defined containment, written instruction, controlled materials, reinspection, traceability, and final release evidence before shipment.<\/p>\n<h3>Can a supplier rework goods without buyer approval?<\/h3>\n<p>The answer depends on the contract and product risk. Buyers should define which corrections a factory may perform under an approved standard instruction and which changes require buyer, engineering, or regulatory review before work begins.<\/p>\n<h3>Is relabeling considered rework?<\/h3>\n<p>It can be a controlled correction action. The buyer should define the artwork revision, variable data, old-label disposition, application method, reinspection, and lot or carton traceability before the supplier relabels goods.<\/p>\n<h3>What should happen after rework is complete?<\/h3>\n<p>The supplier should reinspect the defined corrected scope, retain the original defect and correction records, verify packaging and identity where relevant, and obtain authorized release before the goods are shipped.<\/p>\n<h2>Make rework evidence part of release<\/h2>\n<p>A <strong>China supplier rework control<\/strong> process keeps a correction from becoming an undocumented alteration. It links the defect, affected scope, hold status, written method, rework material, reinspection, traceability, and shipment release so the buyer can decide whether corrected goods meet the stated requirement.<\/p>\n<p>Before the next quality-sensitive order, define a supplier rework form and state which corrections need advance approval. Supplier Ally can help buyers coordinate factory containment, rework evidence, targeted reinspection, product and packaging traceability, and controlled release across China sourcing projects.<\/p>\n<h2>Referencias<\/h2>","protected":false},"excerpt":{"rendered":"<p>Control China supplier rework and repair through defect definition, containment, written instructions, controlled materials, reinspection, traceability, and shipment release.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2161","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"Azar Pamir","author_link":"https:\/\/supplierally.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Control China supplier rework and repair through defect definition, containment, written instructions, controlled materials, reinspection, traceability, and shipment release.","_links":{"self":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/posts\/2161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/comments?post=2161"}],"version-history":[{"count":0,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/posts\/2161\/revisions"}],"wp:attachment":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/media?parent=2161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/categories?post=2161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/tags?post=2161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}