{"id":2160,"date":"2026-08-25T12:16:40","date_gmt":"2026-08-25T12:16:40","guid":{"rendered":"https:\/\/supplierally.com\/uncategorized\/china-supplier-fixture-approval\/"},"modified":"2026-08-25T12:16:40","modified_gmt":"2026-08-25T12:16:40","slug":"china-supplier-fixture-approval","status":"publish","type":"post","link":"https:\/\/supplierally.com\/es\/uncategorized\/china-supplier-fixture-approval\/","title":{"rendered":"How to Approve Production and Inspection Fixtures With China Suppliers"},"content":{"rendered":"<p>A fixture can make a factory faster and more consistent. It can also make the same mistake faster and more consistent if it is built around the wrong product revision, datum, contact point, or test condition. Buyers often approve tooling cost without defining what the fixture must decide, how the factory will identify it, or what evidence proves it works for the intended product.<\/p>\n<p>A <strong>China supplier fixture approval<\/strong> process gives the buyer and factory a controlled way to introduce a production jig, assembly fixture, checking fixture, go or no-go gauge, or functional test setup. It identifies the fixture\u2019s purpose, product revision, required setup, trial output, owner, maintenance expectations, and change-notification rule.<\/p>\n<p>This is general sourcing and quality guidance. It does not validate fixture design, certify measurement traceability, calculate uncertainty, or establish engineering adequacy. Products with tight tolerances, safety consequences, regulated requirements, or high technical risk need qualified engineering, metrology, and quality professionals.<\/p>\n<blockquote>\n<p>A fixture is a production and inspection decision tool, not merely a piece of factory equipment.<\/p>\n<\/blockquote>\n<h2>Identify the fixture\u2019s decision purpose<\/h2>\n<p>Start by defining what the fixture will do. A production fixture may hold, align, clamp, guide, assemble, or protect a part. An inspection fixture may locate a part for dimensional measurement, visual inspection, go or no-go checking, leak testing, electrical testing, or functional verification. The buyer should connect the fixture to a specific decision rather than asking the factory to \u201cmake a jig.\u201d<\/p>\n<table>\n<thead>\n<tr>\n<th>Fixture type<\/th>\n<th>Decision it supports<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Assembly fixture<\/td>\n<td>Positions parts so the required relationship can be built consistently<\/td>\n<\/tr>\n<tr>\n<td>Welding or bonding fixture<\/td>\n<td>Holds geometry during an operation where alignment matters<\/td>\n<\/tr>\n<tr>\n<td>Trim or drilling fixture<\/td>\n<td>Guides a cut, hole, or feature location<\/td>\n<\/tr>\n<tr>\n<td>Checking fixture<\/td>\n<td>Locates the part for a defined dimensional or visual check<\/td>\n<\/tr>\n<tr>\n<td>Go or no-go gauge<\/td>\n<td>Provides a defined acceptance screen for one feature or fit condition<\/td>\n<\/tr>\n<tr>\n<td>Functional test fixture<\/td>\n<td>Connects, loads, powers, or actuates the product for a required test<\/td>\n<\/tr>\n<tr>\n<td>Packing fixture<\/td>\n<td>Helps place, protect, or orient product and accessories in packaging<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The purpose should include the product, operation, critical feature, and intended decision. \u201cFixture for model A\u201d says little. \u201cChecking fixture for model A revision C to locate datum surfaces and verify the mounting-hole pattern before final assembly\u201d gives the factory and buyer a usable baseline.<\/p>\n<h2>Link the fixture to controlled product documents<\/h2>\n<p>A fixture is only reliable for the product definition it was designed around. Ask the supplier to state the drawing, CAD model, sample, specification, or approved product revision used for fixture design. If several variants share a fixture, state which features are common and which inserts, stops, programs, or adjustments change by version.<\/p>\n<table>\n<thead>\n<tr>\n<th>Document-control field<\/th>\n<th>Buyer question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product ID and revision<\/td>\n<td>Which controlled version governed the fixture design?<\/td>\n<\/tr>\n<tr>\n<td>Fixture ID and revision<\/td>\n<td>How will the factory identify this specific fixture?<\/td>\n<\/tr>\n<tr>\n<td>Intended operation<\/td>\n<td>Where in the production or inspection flow will it be used?<\/td>\n<\/tr>\n<tr>\n<td>Critical features<\/td>\n<td>What dimensions, positions, functions, or protections does it control?<\/td>\n<\/tr>\n<tr>\n<td>Datum and contact points<\/td>\n<td>How is the product located and held?<\/td>\n<\/tr>\n<tr>\n<td>Variant scope<\/td>\n<td>Which SKUs, sizes, colors, or configurations may use it?<\/td>\n<\/tr>\n<tr>\n<td>Design owner<\/td>\n<td>Who approves changes to fixture design or software?<\/td>\n<\/tr>\n<tr>\n<td>Storage location<\/td>\n<td>Where is the fixture held when not in use?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not rely on verbal assurance that a fixture fits the latest sample. If a drawing or product change affects a contact point, locating surface, alignment, interface, label position, or test connection, the supplier should evaluate whether the fixture needs adjustment or reapproval before it is used on the changed product.<\/p>\n<h2>Define datums, contact points, and operator setup<\/h2>\n<p>The fixture should reduce ambiguity rather than introduce it. For an inspection fixture, identify the surfaces or points that locate the product, the areas it contacts, the clamps or supports used, and the measurement or test positions. For a production fixture, define how the operator places the part, what prevents incorrect orientation, and what condition must be checked before the operation begins.<\/p>\n<table>\n<thead>\n<tr>\n<th>Setup feature<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Locating datum<\/td>\n<td>Establishes the reference point for consistent positioning<\/td>\n<\/tr>\n<tr>\n<td>Contact surfaces<\/td>\n<td>Shows where the fixture touches or supports the product<\/td>\n<\/tr>\n<tr>\n<td>Clamp or locating pin<\/td>\n<td>Controls movement, force, and orientation<\/td>\n<\/tr>\n<tr>\n<td>Part orientation<\/td>\n<td>Prevents insertion of the wrong face, version, or direction<\/td>\n<\/tr>\n<tr>\n<td>Interchangeable insert<\/td>\n<td>Identifies variant-specific elements that need separate control<\/td>\n<\/tr>\n<tr>\n<td>Operator instruction<\/td>\n<td>Defines loading, check sequence, and unloading method<\/td>\n<\/tr>\n<tr>\n<td>Prevenci\u00f3n de da\u00f1os<\/td>\n<td>Identifies protective material or contact rule for cosmetic surfaces<\/td>\n<\/tr>\n<tr>\n<td>Verification point<\/td>\n<td>States what operator, inspector, or tester must observe<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A fixture can damage a surface or distort a flexible part if contact points are poorly chosen. The buyer does not need to design the fixture, but should identify cosmetic, functional, or safety-sensitive areas that must not be scratched, compressed, blocked, or stressed during use.<\/p>\n<p>NIST states that its manufacturing measurement science, calibrations, and reference materials help manufacturers and suppliers demonstrate quality of materials, equipment, and products.<a href=\"https:\/\/www.nist.gov\/manufacturing\" title=\"NIST: Manufacturing\" target=\"_blank\" rel=\"noopener\">1<\/a> In the buyer\u2019s workflow, the relevant lesson is that fixtures used for inspection or testing should be treated as part of the measurement or control system, not as informal shop equipment.<\/p>\n<h2>Approve trial output before relying on the fixture<\/h2>\n<p>Before the fixture is used for routine production or release inspection, request a trial. The trial should use the current product configuration and show that the fixture performs the purpose defined in the instruction. Evidence can include photos, video, measurement results, test records, trial assemblies, or first-off parts, depending on risk.<\/p>\n<table>\n<thead>\n<tr>\n<th>Trial question<\/th>\n<th>Evidence to request<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Does the part fit correctly?<\/td>\n<td>Photos or video of proper loading, contact, and release<\/td>\n<\/tr>\n<tr>\n<td>Does the fixture locate the intended features?<\/td>\n<td>Setup drawing, marked sample, or measurement evidence<\/td>\n<\/tr>\n<tr>\n<td>Does operation produce acceptable output?<\/td>\n<td>First-off part, assembly result, or functional-test record<\/td>\n<\/tr>\n<tr>\n<td>Can the operator use it consistently?<\/td>\n<td>Work instruction and trial observation or operator feedback<\/td>\n<\/tr>\n<tr>\n<td>Does it avoid product damage?<\/td>\n<td>Inspection of contact areas and cosmetic surfaces after use<\/td>\n<\/tr>\n<tr>\n<td>Does it distinguish variants correctly?<\/td>\n<td>Trial of each applicable SKU, insert, or configuration<\/td>\n<\/tr>\n<tr>\n<td>Does the check agree with the approved method?<\/td>\n<td>Comparison with qualified measurement or test evidence where needed<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A trial fixture approval is not the same as mass-production release. It means the buyer has reviewed evidence that the fixture is suitable for its defined role. The factory still needs to control materials, assembly, workmanship, testing, and other production variables.<\/p>\n<h2>Use measurement evidence carefully for inspection fixtures<\/h2>\n<p>An inspection fixture can make a measurement or acceptance check more repeatable, but it does not eliminate all measurement uncertainty. For a critical feature, ask the supplier to show how the fixture and gauge are used together, which product revision applies, and how the result is tied to a controlled method.<\/p>\n<p>NIST defines metrological traceability as a documented unbroken chain of calibrations to specified reference standards and explains that the provider of a measurement result is responsible for supporting its traceability claim.<a href=\"https:\/\/www.nist.gov\/metrology\/metrological-traceability\" title=\"NIST: Metrological Traceability\" target=\"_blank\" rel=\"noopener\">2<\/a> NIST also notes that traceability alone does not guarantee fitness for purpose.<a href=\"https:\/\/www.nist.gov\/metrology\/metrological-traceability\" title=\"NIST: Metrological Traceability\" target=\"_blank\" rel=\"noopener\">2<\/a> A factory should therefore not describe a checking fixture as \u201ctraceable\u201d merely because it holds a part. The supplier must show that the full measurement method and level of uncertainty are suitable for the decision.<\/p>\n<table>\n<thead>\n<tr>\n<th>Inspection-fixture review<\/th>\n<th>Buyer control<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Fixture ID<\/td>\n<td>Record the fixture used for the reported measurement or check<\/td>\n<\/tr>\n<tr>\n<td>Gauge or instrument<\/td>\n<td>Identify the measurement tool paired with the fixture<\/td>\n<\/tr>\n<tr>\n<td>Product setup<\/td>\n<td>Show datum, support, clamp, and orientation instruction<\/td>\n<\/tr>\n<tr>\n<td>Method reference<\/td>\n<td>Link the check to drawing revision, tolerance, or inspection plan<\/td>\n<\/tr>\n<tr>\n<td>Trial results<\/td>\n<td>Compare representative output with the buyer-approved method<\/td>\n<\/tr>\n<tr>\n<td>Maintenance status<\/td>\n<td>Confirm no visible damage or unauthorized modification affects use<\/td>\n<\/tr>\n<tr>\n<td>Exception action<\/td>\n<td>Hold result for review when fixture or method differs from baseline<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Article 052 covered measurement repeatability. Fixture approval is the physical-control counterpart: it ensures the method has a stable, identified way to locate and present the part for the check.<\/p>\n<h2>Identify, store, and maintain the fixture<\/h2>\n<p>A good fixture can lose usefulness after damage, wear, corrosion, loose pins, changed inserts, missing protective pads, or an unauthorized repair. Ask the factory to give each critical fixture an identifier and a controlled storage location. The maintenance plan should match its importance and use frequency.<\/p>\n<table>\n<thead>\n<tr>\n<th>Fixture-control item<\/th>\n<th>Factory practice<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ID tag or mark<\/td>\n<td>Identifies fixture and revision at the point of use<\/td>\n<\/tr>\n<tr>\n<td>Storage location<\/td>\n<td>Protects it from damage and prevents mixup with similar tooling<\/td>\n<\/tr>\n<tr>\n<td>Pre-use check<\/td>\n<td>Confirms cleanliness, visible condition, inserts, and components before use<\/td>\n<\/tr>\n<tr>\n<td>Planned maintenance<\/td>\n<td>Defines cleaning, lubrication, replacement, or verification actions where needed<\/td>\n<\/tr>\n<tr>\n<td>Damage record<\/td>\n<td>Captures bent, worn, missing, or altered parts and disposition<\/td>\n<\/tr>\n<tr>\n<td>Spare or duplicate fixture<\/td>\n<td>Identifies whether it is interchangeable and how its approval is controlled<\/td>\n<\/tr>\n<tr>\n<td>Custody record<\/td>\n<td>Shows factory responsibility, especially if buyer-owned tooling applies<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not assume a replacement fixture is equivalent because it looks similar. If a second fixture will make acceptance decisions, the factory should identify it separately and perform the appropriate trial or comparison before using it for a critical feature.<\/p>\n<h2>Require a fixture-change notification process<\/h2>\n<p>A change in product often changes fixture suitability. A change in fixture can also change product output or inspection results. The supplier should notify the buyer before altering a critical fixture\u2019s locating features, contacts, program, inserts, material, dimensions, sensor, tester setting, or intended product scope.<\/p>\n<table>\n<thead>\n<tr>\n<th>Proposed fixture change<\/th>\n<th>Buyer response<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>New product revision affects locating area<\/td>\n<td>Review whether fixture must change before production continues<\/td>\n<\/tr>\n<tr>\n<td>Fixture contact point is repaired<\/td>\n<td>Request evidence of repair and trial result for critical fixtures<\/td>\n<\/tr>\n<tr>\n<td>New insert or stop added<\/td>\n<td>Verify variant scope and first-off output<\/td>\n<\/tr>\n<tr>\n<td>Tester program changed<\/td>\n<td>Route to the appropriate engineering or test owner before use<\/td>\n<\/tr>\n<tr>\n<td>Fixture duplicated<\/td>\n<td>Identify the duplicate and perform comparison evidence as needed<\/td>\n<\/tr>\n<tr>\n<td>Fixture damaged<\/td>\n<td>Hold use for critical decision until repair or replacement is reviewed<\/td>\n<\/tr>\n<tr>\n<td>Factory proposes alternate method<\/td>\n<td>Compare against controlled method and authorize before adoption<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The notification should describe the change, reason, affected SKUs or lots, evidence, and planned implementation date. This gives the buyer time to decide whether an engineering review, new sample, first article, measurement comparison, or independent inspection is needed.<\/p>\n<h2>Handle fixture and buyer result disagreements<\/h2>\n<p>If the factory fixture says a part passes but the buyer\u2019s measurement or assembly result disagrees, first compare the product revision, sample identity, datum, fixture setup, gauge, method, and operator instructions. Do not assume the factory is wrong because it used a fixture, or that the buyer is wrong because its result came from a different method.<\/p>\n<table>\n<thead>\n<tr>\n<th>Disagreement<\/th>\n<th>First action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Factory check passes but buyer dimension fails<\/td>\n<td>Preserve samples and compare fixture datum, gauge, and measurement method<\/td>\n<\/tr>\n<tr>\n<td>Fixture damages product<\/td>\n<td>Stop use, inspect affected output, and review contact and loading conditions<\/td>\n<\/tr>\n<tr>\n<td>Variant fits incorrectly<\/td>\n<td>Confirm inserts, stops, product revision, and loading orientation<\/td>\n<\/tr>\n<tr>\n<td>Two factory fixtures disagree<\/td>\n<td>Identify fixture IDs and compare trial output before release<\/td>\n<\/tr>\n<tr>\n<td>Fixture changed without notice<\/td>\n<td>Hold affected scope and request factual change and trial record<\/td>\n<\/tr>\n<tr>\n<td>Test fixture gives inconsistent result<\/td>\n<td>Verify setup, equipment condition, and product configuration before retest<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For a high-consequence problem, use qualified engineering or metrology support. The buyer\u2019s role is to preserve the evidence and prevent a disputed fixture decision from becoming an uncontrolled shipment release.<\/p>\n<h2>Retain a practical fixture approval package<\/h2>\n<p>The record can remain compact: purpose, product and fixture revisions, setup or contact diagram, trial evidence, identified owner, maintenance expectation, change history, and release decision. This package supports later production, inspection, supplier transfer, and dispute review.<\/p>\n<table>\n<thead>\n<tr>\n<th>Package item<\/th>\n<th>Later use<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Fixture purpose and scope<\/td>\n<td>Shows what decision it was approved to support<\/td>\n<\/tr>\n<tr>\n<td>Product and fixture revision<\/td>\n<td>Establishes the controlled baseline<\/td>\n<\/tr>\n<tr>\n<td>Setup instruction<\/td>\n<td>Helps reproduce correct loading and operation<\/td>\n<\/tr>\n<tr>\n<td>Trial output or records<\/td>\n<td>Shows initial evidence of suitability<\/td>\n<\/tr>\n<tr>\n<td>Fixture ID and location<\/td>\n<td>Enables identification in factory and audit records<\/td>\n<\/tr>\n<tr>\n<td>Maintenance or damage record<\/td>\n<td>Explains changes in fixture condition over time<\/td>\n<\/tr>\n<tr>\n<td>Change notification history<\/td>\n<td>Shows when the baseline changed and who authorized it<\/td>\n<\/tr>\n<tr>\n<td>Final approval record<\/td>\n<td>Identifies the buyer or factory owner who released use<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a production fixture from a China supplier?<\/h3>\n<p>It is a jig, holder, guide, clamp, or setup used to position or control a product during manufacturing, assembly, testing, or packing. The buyer should define its purpose and link it to the correct product revision.<\/p>\n<h3>Is an inspection fixture the same as a calibrated gauge?<\/h3>\n<p>No. An inspection fixture may position a part for a check, while a gauge or instrument provides the measurement. A critical result may depend on the fixture, gauge, method, calibration status, and operator setup together.<\/p>\n<h3>When should a buyer approve a fixture trial?<\/h3>\n<p>Request a trial before a new or changed fixture is used for critical production, acceptance inspection, functional testing, or a customer-sensitive product feature. The evidence should match the fixture\u2019s decision purpose.<\/p>\n<h3>What should happen when a factory changes a fixture?<\/h3>\n<p>The supplier should notify the buyer before implementing a critical change, identify the affected products, provide trial or comparison evidence, and obtain the appropriate review before using the changed fixture for production or release.<\/p>\n<h2>Make fixture use visible and controlled<\/h2>\n<p>A <strong>China supplier fixture approval<\/strong> process turns a factory jig or checking setup into controlled evidence. It connects the fixture\u2019s purpose, product revision, physical setup, trial output, maintenance condition, change history, and release decision before the factory relies on it for production or inspection.<\/p>\n<p>Before the next fixture-dependent order, add a fixture approval page to the supplier\u2019s production package. Supplier Ally can help buyers coordinate fixture purpose, factory trial evidence, measurement and test records, tooling-change communication, and targeted third-party verification across China sourcing projects.<\/p>\n<h2>Referencias<\/h2>","protected":false},"excerpt":{"rendered":"<p>Approve China supplier production and inspection fixtures with defined purpose, product revision linkage, trial output, maintenance, change notification, and controlled release.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2160","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"Azar Pamir","author_link":"https:\/\/supplierally.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Approve China supplier production and inspection fixtures with defined purpose, product revision linkage, trial output, maintenance, change notification, and controlled release.","_links":{"self":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/posts\/2160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/comments?post=2160"}],"version-history":[{"count":0,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/posts\/2160\/revisions"}],"wp:attachment":[{"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/media?parent=2160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/categories?post=2160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/supplierally.com\/es\/wp-json\/wp\/v2\/tags?post=2160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}